2026-06-25 Data
Supply refresh — June 25 onchain readings
- Refreshed the market tracker with verified June 25 figures (Blockscout total supply): CADD 1.13M (ETH 522,676 + Base 610,150, +2K since Jun 10), CADC 2.37M (ETH 853,857 + Base 1,513,491, +20K on Base). QCAD held flat at 1.45M (CoinGecko all-chain circulating).
- Total CAD tracked rises to $4.95M. No regulatory changes this cycle — draft regulations under the Stablecoin Act remain pending (consultation expected later in 2026).
2026-06-10 Feature
Market tracker, changelog, new hero
- Added the CAD stablecoin market tracker — supply sparklines for QCAD, CADD, and CADC with per-point provenance. June 10 figures verified onchain via Blockscout (QCAD 1.45M aggregate, CADD 1.13M ETH+Base, CADC 2.35M ETH+Base).
- Introduced this changelog and the day-counter strip on the homepage.
- New hero copy; retired the single-event news strip.
2026-06-05 Scorecard
Yield-prohibition watch: Kraken QCAD rewards
- Flagged Kraken's QCAD rewards (up to 2% APY, routed exchange-side) against the Act's ban on paying yield "directly or indirectly".
- Added C.D. Howe Institute comparison to the US GENIUS Act wording.
2026-05-25 Feature
FX Cost Calculator and programmable-layer map
- Shipped the USDC-vs-CAD-native FX cost calculator with round-trip spread modelling.
- Added the RTR × stablecoin layer map: core ledgers, instant retail, programmable layer.
2026-05-21 Data
QCAD on Circle StableFX (Arc testnet)
- Added cross-border section: QCAD/USDC as the first onchain CAD/USD settlement pair — PvP atomic, T+0.
- Updated QCAD chain coverage to include Arc (testnet).
2026-05-05 Scorecard
Three-issuer expansion
- Expanded coverage from QCAD-only to three issuers following CADD's May 4 public launch.
- Added CADC (Loon, ex-Paytrie) rows and the issuer comparison page.
- Scorecard now tracks 15 requirements across 8 categories.
2026-04-22 Launch
StableLoonie launches
- Bill C-15 Compliance Scorecard goes live, tracking QCAD against the Stablecoin Act (Royal Assent March 26, 2026).
- Regulatory timeline from Royal Assent to earliest in-force (February 2027).